Skip to content

Hotel / spa

Hotel Sun Garden

Cluj

HotelsPools & spaor message us on WhatsApp
System
Biomass boiler
Controls
Automation and monitoring
Spa
Heating for the spa area

A central biomass system for the hotel and the spa area, with automation and monitoring.

  • Central biomass heating system
  • Automation and monitoring
  • Heating for the spa area
Plant room · Hotel Sun Garden

Project photo gallery

Equipment used in this project

Full technical data is available on each product's page. We can size the same Hargassner equipment for your building.

Similar projects

  • Hotel Ivașcu in Moisei from above, at the foot of the mountainHotelHotel Ivașcu's plant room with the two Hargassner ECO-HK 330 kW boilersPlant room

    Moisei660 kW~6,000 m²

    Boilers: 2 × ECO-HK 330 kW in cascade

  • Hotel Panoramic's outdoor pool in winter, surrounded by snow, overlooking the lake and mountainsHotelHotel Panoramic's plant room with the two Hargassner ECO-HK 120 kW boilersPlant room

    Colibița240 kW~4,000 m²

    Boilers: 2 × ECO-HK 120 kW in cascade

  • Roser House from above: the hotel, its terraces and outdoor poolsHotel / guesthouseThe wood chip store at Roser House, with the rotary agitator and the extraction augersChip store

    Colibița240 kW~2,800 m²

    Boilers: 2 × ECO-HK 120 kW in cascade

We can size a similar system for your building.

The heated floor area, how well it is insulated and which fuel you have to hand. The final quote follows the technical assessment.

or message us on WhatsApp
  • Free technical consultation
  • Authorised Hargassner dealer
  • Delivery and installation across Romania